All spots have already been filled.
« go back to the Sign-Up Sheet
Download the Net Control Procedures here
Download the Sunday 70cm Net Control procedures here
All spots have already been filled.
« go back to the Sign-Up Sheet
Download the Net Control Procedures here
Download the Sunday 70cm Net Control procedures here
CW Hotline Kit construction is scheduled for 3rd June, 6PM at the Westlake Fire Station